September 2017

The road to owning a house. Week 11 – 1st floor walling & Ring beam

Week 11.  Sept 11th – September 16th  2017 We are now on the 2nd half of this series. Just less than 10 weeks before the house is handed over by the contractor to the client. This week the client will work on erecting the roof trusses. Special thanks to the client for allowing us to take the photos and granting us access every week. Kariùki Wawerù PS. Kariùki Wawerù is the author of...

The road to owning a house. Week 10 – 1st floor walling

Week 10.  Sept 04th – September 9th  2017   This week the client will work finishing the 1st floor walling . Special thanks to the client for allowing us to take the photos and granting us access every week. Kariùki Wawerù PS. Kariùki Wawerù is the author of Kenya’s ONLY real estate book called “The ABC of Real Estate Investment in Kenya”. To have the book...

The road to owning a house. Week 9 – Slab….finally

Week 9.  Aug 28th – September 3rd  2017 Steel work preparation Preparation for Slab "Math" on how the steel will be cut The materials arrived in good time The men did their job The end product This week the client will work on the 1st floor walling . Special thanks to the client for allowing us to take the photos and granting us access every week. Kariùki Wawerù PS. Kariùki...

Compare listings

Compare