Week 22 . 27th November – 2nd December 2017 End of initial contract period but the contractor has been allowed an extension. New date of completion is on Dec 15 2017. Manholes leading to the septic tank. They need to slope to allow for the waste to flow using gravity. Kitchen cabinets after the design by the Interior designer. Currently being installed. Cake of the week. All edible. Call 0724 77...