#MrsW’shouse

#MrsW’shouse – Week 7

Material blue gum poles 3*2 timber 5*6 timber 10 sheets marine boards 6*1 timber 75kgs 3" nails 300 metal trappers In week 7 the contractor started preparing for the slab- to be done in week 8 they started by placing the 3*2 poles on the shortest side of the room. They added the poles as a support structure.  For sides that would require minimal plaster, we placed marine...

#MrsW’shouse – Week 4 Foundation final stage.

This week the contractor finalized on the masonry work in the foundation. Depending on the height prescribed in the drawing, the foundation had about 4 courses in the higher sides and up to 7 courses in the lowest land levels. Backfilling The backfilling also took place this week.  The contractor returned all the red soil into the wall space, then left a gap of about 1 foot to the top.  the...

#MrsW’shouse – Week 3 Foundation Part 2

Materials Ballast Cement sand stone Hardcore Quarry dust Metal bars for the beams and columns 6*1 wood to form frames for the beams The structural engineer this week made his first site visit to confirm the contractors had reached stable ground where they could construct the foundation of the house. The trenches were about 3 feet deep. The strip footing...

#MrsW’shouse – Week 2 Foundation Part 1

Items required this week Hose pipe Fork jembes - provided by the contractor Spades - Provided by the contractor Plumb line (Kabiru) Materials  D10 D8 D12 Binding wire This week the contractor started digging the foundation trenches. The land is on a slope of about 2.7m and this week we were grateful that the architect  requested us to get a topography survey done before she...

#MrsW’shouse – Preliminaries and setting out

Construction Preparation This happened as we waited for the approval of the architectural and the structural plans with the county government.   To save on time we did some land preparation. The land had quite a lot of trees which unfortunately were cut down to pave way for construction. The tree stumps left were too sturdy and needed an excavator to uproot. There was also a banana...

#MrsW’shouse – Questions from the readers

The readers had some questions for Mrs W and she was happy to answer them. What is a cantilever/Double volume A Cantilever is a slab that appears to be floating.  it doesn't have visible beams/ columns supporting it and it is also not attached to any side of the wall.  it is basically a floating slab.     The double volume ceiling is twice the length of a normal room height. Normal ceiling...

#MrsW’shouse – The decision to build a house

Last week we looked at the process of acquiring the plot. Click here to read about it. Today we will see how the decision to build a house was arrived at. The objective of this series is to educate you our readers about the process of home acquisition.   Who you are..,age, kids,marital status, how long have you been married etc So we are the W's. We met in Campus in 2010, got engaged on 19 Oct...

#MrsW’shouse – The process of acquiring the plot.

One of the loyal readers, Let’s call her “Mrs W”, on this blog reached out to me with a very interesting request. She would like me to cover the story about buying their land and building their home. I asked her to answer a few questions to bring us up-to speed with their project. The objective of this series is to educate you our readers about the process of home acquisition. We begin with the...