Items required this week Hose pipe Fork jembes - provided by the contractor Spades - Provided by the contractor Plumb line (Kabiru) Materials D10 D8 D12 Binding wire This week the contractor started digging the foundation trenches. The land is on a slope of about 2.7m and this week we were grateful that the architect requested us to get a topography survey done before she...